[ 
https://issues.apache.org/jira/browse/GIRAPH-917?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14041504#comment-14041504
 ] 

Pavan Kumar commented on GIRAPH-917:
------------------------------------

It is not really fixed!
https://issues.apache.org/jira/browse/GIRAPH-915
Please take a look at the comments. I pushed it on 18th & still we see ABORTED

> Every commit is followed by ABORTED: Integrated in Giraph-trunk-Commit
> ----------------------------------------------------------------------
>
>                 Key: GIRAPH-917
>                 URL: https://issues.apache.org/jira/browse/GIRAPH-917
>             Project: Giraph
>          Issue Type: Task
>            Reporter: Pavan Kumar
>
> Currently, every continuous build is aborted, because it is taking too long. 
> Shouldn't we reduce the testing time so we can be with in the time limit or 
> have a way to increase the time limits.
> Would be great if some one from PMC can take a look. This issue has been 
> bugging us for very long now. Continuous build has become useless in 
> verifying correctness of commit because of this issue.
> Thanks.



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Reply via email to