[
https://issues.apache.org/jira/browse/GOBBLIN-2017?focusedWorklogId=922635&page=com.atlassian.jira.plugin.system.issuetabpanels:worklog-tabpanel#worklog-922635
]
ASF GitHub Bot logged work on GOBBLIN-2017:
-------------------------------------------
Author: ASF GitHub Bot
Created on: 07/Jun/24 19:02
Start Date: 07/Jun/24 19:02
Worklog Time Spent: 10m
Work Description: arjun4084346 commented on code in PR #3965:
URL: https://github.com/apache/gobblin/pull/3965#discussion_r1631590659
##########
gobblin-service/src/main/java/org/apache/gobblin/service/modules/orchestration/proc/ReevaluateDagProc.java:
##########
@@ -60,21 +59,19 @@ protected Pair<Optional<Dag.DagNode<JobExecutionPlan>>,
Optional<JobStatus>> ini
Pair<Optional<Dag.DagNode<JobExecutionPlan>>, Optional<JobStatus>>
dagNodeWithJobStatus =
dagManagementStateStore.getDagNodeWithJobStatus(this.dagNodeId);
- if (!dagNodeWithJobStatus.getLeft().isPresent() ||
!dagNodeWithJobStatus.getRight().isPresent()) {
+ if (!dagNodeWithJobStatus.getLeft().isPresent()) {
// this is possible when MALA malfunctions and a duplicated reevaluate
dag proc is launched for a dag node that is
// already "reevaluated" and cleaned up.
return ImmutablePair.of(Optional.empty(), Optional.empty());
}
- ExecutionStatus executionStatus =
ExecutionStatus.valueOf(dagNodeWithJobStatus.getRight().get().getEventName());
- if
(!FlowStatusGenerator.FINISHED_STATUSES.contains(executionStatus.name())) {
- log.warn("Job status for dagNode {} is {}. Re-evaluate dag action should
have been created only for finished status - {}",
- dagNodeId, executionStatus, FlowStatusGenerator.FINISHED_STATUSES);
- // this may happen if adding job status in the store failed after adding
a ReevaluateDagAction in KafkaJobStatusMonitor
- throw new RuntimeException(String.format("Job status %s is not final for
job %s", executionStatus, getDagId()));
+ if (dagNodeWithJobStatus.getRight().isPresent()) {
Review Comment:
```// Usually reevaluate dag action is created by JobStatusMonitor when a
finished job status is available,
// but when reevaluate/resume/launch dag proc found multiple parallel
jobs to run next, it creates reevaluate
// dag actions for each of those parallel job and in this scenario
there is no job status available.
// If the job status is not present, this job was never launched,
submit it now.```
Issue Time Tracking
-------------------
Worklog Id: (was: 922635)
Time Spent: 2h 40m (was: 2.5h)
> divide multiple job launches in a LaunchDagProc into multiple LaunchDagActions
> ------------------------------------------------------------------------------
>
> Key: GOBBLIN-2017
> URL: https://issues.apache.org/jira/browse/GOBBLIN-2017
> Project: Apache Gobblin
> Issue Type: Task
> Reporter: Arjun Singh Bora
> Priority: Major
> Time Spent: 2h 40m
> Remaining Estimate: 0h
>
> divide multiple job launches in a LaunchDagProc into multiple
> LaunchDagActions for two reasons
> 1) it will then spend less time in each dag proc processing and have more
> chance to complete the operation in the lease time
> 2) handling partial job submissions in one LaunchDagProc sending N jobs is
> difficult
--
This message was sent by Atlassian Jira
(v8.20.10#820010)