Nick Dimiduk created HBASE-25632:
------------------------------------

             Summary: Document suggested settings for 
PressureAwareCompactionThroughputController
                 Key: HBASE-25632
                 URL: https://issues.apache.org/jira/browse/HBASE-25632
             Project: HBase
          Issue Type: Task
          Components: Compaction, documentation
    Affects Versions: 2.3.0
            Reporter: Nick Dimiduk


After upgrading a cluster to 2.3, we noticed that compactions were taking much 
longer. We tracked this down to the 
{{PressureAwareCompactionThroughputController}}, which became default as part 
of our upgrade. Our default configuration settings set the lower bound: 50MB/s, 
upper bound: 100MB/s. These settings make sense if you have a 1gbit NIC (~120 
MB/s). For a 10gbit NIC, they’re quite inadequate.

Let's document this component explicitly and mention it as a call-out in the 
section on upgrading. Bonus points if we can provide suggested configuration 
values for the common networking configurations.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to