Bryan Beaudreault created HBASE-27380:
-----------------------------------------
Summary: RitDuration histogram metric is broken
Key: HBASE-27380
URL: https://issues.apache.org/jira/browse/HBASE-27380
Project: HBase
Issue Type: Bug
Reporter: Bryan Beaudreault
Looks like the method which updates it in MetricsAssignmentManager,
updateRitDuration, got broken somewhere along the way. It's no longer used. We
should wire this back up.
https://github.com/apache/hbase/blob/master/hbase-server/src/main/java/org/apache/hadoop/hbase/master/MetricsAssignmentManager.java#L82
--
This message was sent by Atlassian Jira
(v8.20.10#820010)