Bryan Beaudreault created HBASE-27399:
-----------------------------------------
Summary: Add config for setting a max actions per normalizer run
Key: HBASE-27399
URL: https://issues.apache.org/jira/browse/HBASE-27399
Project: HBase
Issue Type: Improvement
Reporter: Bryan Beaudreault
When you enable the normalizer for the first time on an existing table, the
next time it runs it can do a massive amount of merges/splits. This can be
painful for callers.
Additionally, if someone were to write a large amount of Puts or Deletes it may
cause a merge/split storm as well.
We should add a config which allows operators to limit the amount of actions
per run. This way the normalizer can work towards its plan gracefully over the
course of a few hours rather than all at once.
--
This message was sent by Atlassian Jira
(v8.20.10#820010)