[ 
https://issues.apache.org/jira/browse/HBASE-30249?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Duo Zhang resolved HBASE-30249.
-------------------------------
    Hadoop Flags: Reviewed
      Resolution: Fixed

Pushed to master and branch-3.

Thanks [~liuxiaocs] for reviewing!

> Make TestSyncReplicationStandbyKillMaster stable
> ------------------------------------------------
>
>                 Key: HBASE-30249
>                 URL: https://issues.apache.org/jira/browse/HBASE-30249
>             Project: HBase
>          Issue Type: Sub-task
>          Components: Replication, test
>            Reporter: Duo Zhang
>            Assignee: Duo Zhang
>            Priority: Major
>              Labels: pull-request-available
>             Fix For: 3.0.0-beta-2
>
>
> After analyzing, the problem is that, we want to test master switch when 
> transiting, but actually, the procedure can be finished within 1 second but 
> we will kill mastr after 2 seconds, so we just test nothing, and the master 
> killing operation will mess up the code in tearDown and fail the test...



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to