Vihang Karajgaonkar created HIVE-19505:
------------------------------------------
Summary: Increase number of parallel runs from 2 per node to 4
Key: HIVE-19505
URL: https://issues.apache.org/jira/browse/HIVE-19505
Project: Hive
Issue Type: Sub-task
Reporter: Vihang Karajgaonkar
Assignee: Vihang Karajgaonkar
The test cluster is under utilized. For the short run we can increase the
parallel threads from 2 to 3 (or may be 4) which will speedup parallel test
batches.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)