Jesus Camacho Rodriguez created HIVE-20783:
----------------------------------------------
Summary: Factor reduction in cost by DPP when costing SJ reduction
Key: HIVE-20783
URL: https://issues.apache.org/jira/browse/HIVE-20783
Project: Hive
Issue Type: Bug
Components: Physical Optimizer
Reporter: Jesus Camacho Rodriguez
Assignee: Jesus Camacho Rodriguez
Currently, while costing the SJ in a plan, the stats of the a TS that is
reduced by a SJ are not adjusted after we have decided to keep a SJ in the
tree. Ideally, we could adjust the stats to take into account decisions that
have already been made.
--
This message was sent by Atlassian JIRA
(v7.6.3#76005)