[
https://issues.apache.org/jira/browse/HIVE-4420?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Alan Gates updated HIVE-4420:
-----------------------------
Attachment: HIVE-4420.patch
Attaching a patch that puts the tests in a parallel structure so that each one
is run. Tests are still run serially by setting parallelism to 1, but a side
effect of parallel is that each of its components is run even if one of them
fails.
> HCatalog unit tests stop after a failure
> ----------------------------------------
>
> Key: HIVE-4420
> URL: https://issues.apache.org/jira/browse/HIVE-4420
> Project: Hive
> Issue Type: Bug
> Components: Build Infrastructure, HCatalog
> Affects Versions: 0.11.0
> Reporter: Alan Gates
> Assignee: Alan Gates
> Fix For: 0.12.0
>
> Attachments: HIVE-4420.patch
>
>
> HCatalog splits it's different components (core, hcatalog-pig-adaptor,
> webhcat, etc.) into separate build.xml files, all controlled by the top
> build.xml. A side effect of this is that when the user does "ant test" and
> the top build file is iterating through the tests, if one of the component's
> test targets fail then unit tests are not run for subsequent components.
> This means a failure in one component can mask issues in others.
> test should run on all the components even when there is a failure in one of
> the components.
--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira