[
https://issues.apache.org/jira/browse/HIVE-6439?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13902860#comment-13902860
]
Hive QA commented on HIVE-6439:
-------------------------------
{color:green}Overall{color}: +1 all checks pass
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12629280/HIVE-6439.2.patch
{color:green}SUCCESS:{color} +1 5120 tests passed
Test results:
http://bigtop01.cloudera.org:8080/job/PreCommit-HIVE-Build/1348/testReport
Console output:
http://bigtop01.cloudera.org:8080/job/PreCommit-HIVE-Build/1348/console
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12629280
> Introduce CBO step in Semantic Analyzer
> ---------------------------------------
>
> Key: HIVE-6439
> URL: https://issues.apache.org/jira/browse/HIVE-6439
> Project: Hive
> Issue Type: Sub-task
> Reporter: Harish Butani
> Assignee: Harish Butani
> Attachments: HIVE-6439.1.patch, HIVE-6439.2.patch
>
>
> This patch introduces CBO step in SemanticAnalyzer. For now the
> CostBasedOptimizer is an empty shell.
> The contract between SemAly and CBO is:
> - CBO step is controlled by the 'hive.enable.cbo.flag'.
> - When true Hive SemAly will hand CBO a Hive Operator tree (with operators
> annotated with stats). If it can CBO will return a better plan in Hive AST
> form.
--
This message was sent by Atlassian JIRA
(v6.1.5#6160)