[
https://issues.apache.org/jira/browse/HIVE-7005?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14031741#comment-14031741
]
Hive QA commented on HIVE-7005:
-------------------------------
{color:red}Overall{color}: -1 at least one tests failed
Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12650238/HIVE-7005.1.patch
{color:red}ERROR:{color} -1 due to 5 failed/errored test(s), 5611 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestCliDriver.testCliDriver_parquet_columnar
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_scriptfile1
org.apache.hadoop.hive.cli.TestMinimrCliDriver.testCliDriver_root_dir_external_table
org.apache.hadoop.hive.cli.TestNegativeCliDriver.testNegativeCliDriver_authorization_ctas
org.apache.hive.jdbc.miniHS2.TestHiveServer2.testConnection
{noformat}
Test results:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-Build/466/testReport
Console output:
http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-Build/466/console
Test logs:
http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-Build-466/
Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 5 tests failed
{noformat}
This message is automatically generated.
ATTACHMENT ID: 12650238
> MiniTez tests have non-deterministic explain plans
> --------------------------------------------------
>
> Key: HIVE-7005
> URL: https://issues.apache.org/jira/browse/HIVE-7005
> Project: Hive
> Issue Type: Bug
> Components: Tests
> Reporter: Jason Dere
> Assignee: Gunther Hagleitner
> Attachments: HIVE-7005.1.patch
>
>
> TestMiniTezCliDriver has a few test failures where there is a diff in the
> explain plan generated. According to Vikram, the plan generated is correct,
> but the plan can be generated in a couple of different ways and so sometimes
> the plan will not diff against the expected output. We should probably come
> up with a way to validate this explain plan in a reproducible way.
--
This message was sent by Atlassian JIRA
(v6.2#6252)