GitHub user geserdugarov edited a comment on the discussion: 1.2 Release Planning
@vinothchandar , @yihua , about DSv2, I propose not to include this task for 1.2 release scope. I would say that milestone at 1.2 release would be POC implementation (draft PR) with benchmark results, and full design of corresponding RFC with writer path considering V1 and V2. And then, proper review could possibly take a lot of time, for instance, review of [Spark 4 support](https://github.com/apache/hudi/pull/12772) took about 7 months (from Feb to Sep). So, the optimistic scenario is to prepare production ready functionality for 1.3 release. In negative scenarios, it will take more time depending on RFC design feedback. GitHub link: https://github.com/apache/hudi/discussions/14307#discussioncomment-15195415 ---- This is an automatically sent email for [email protected]. To unsubscribe, please send an email to: [email protected]
