GitHub user geserdugarov edited a comment on the discussion: 1.2 Release 
Planning

@vinothchandar , @yihua , about DSv2, I propose not to include this task for 
1.2 release scope. I would say that milestone at 1.2 release would be POC 
implementation (draft PR) with benchmark results, and full design of 
corresponding RFC with writer path considering V1 and V2. And then, proper 
review could possibly take a lot of time, for instance, review of [Spark 4 
support](https://github.com/apache/hudi/pull/12772) took about 7 months (from 
Feb to Sep). So, the optimistic scenario is to prepare production ready 
functionality for 1.3 release. In negative scenarios, it will take more time 
depending on RFC design feedback.

GitHub link: 
https://github.com/apache/hudi/discussions/14307#discussioncomment-15195415

----
This is an automatically sent email for [email protected].
To unsubscribe, please send an email to: [email protected]

Reply via email to