Hi All,

It seems that we intend to have two parallel jobs at most:

   - Maximum Total Concurrent Builds: 2
   - Maximum Concurrent Builds Per Node: 1

However, all jobs run on master and then spawn subsequent jobs on worker
nodes. This limits the maximum number of concurrent jobs to 1.

If no-one objects, I will change this number to two concurrent jobs.

Cheers, Lars

Reply via email to