Hi All, It seems that we intend to have two parallel jobs at most:
- Maximum Total Concurrent Builds: 2 - Maximum Concurrent Builds Per Node: 1 However, all jobs run on master and then spawn subsequent jobs on worker nodes. This limits the maximum number of concurrent jobs to 1. If no-one objects, I will change this number to two concurrent jobs. Cheers, Lars