Nilay Parmar created JCR-3488:
---------------------------------
Summary: JCR is taking longer time to release the lock on DMS node
Key: JCR-3488
URL: https://issues.apache.org/jira/browse/JCR-3488
Project: Jackrabbit Content Repository
Issue Type: Bug
Components: clustering, locks
Affects Versions: 2.2.7
Environment: 5 nodes Cluster environment with windows server OS and
shared datastore
Reporter: Nilay Parmar
Priority: Blocker
We have implemented web based DMS using Jackrabbit(2.2.7). This system is
installed in clustered environment with windows server OS.
Now, as we know DMS datastore is in tree structure and when we upload any
document, jackrabbit locks the parent node, create a child node for the
document which we want to upload and then releases the lock from parent node.
This locking process is synchronized. If any particular parent node is locked
for one document upload, other thread cannot acquire lock on that node until
previous thread release the lock. Jackrabbit implementation prevents from any
deadlock situation.
As per our implementation, parent node is locked between creating a child node
and set some of the properties. While putting actual content, we do not lock
the parent node.
Now, sometimes lock duration is more than 50 seconds and hence, next thread is
not able to upload the document as it not getting the lock within time frame.
This is a 5 nodes clustered environment and it requires synchronization
activity, indexing activity, etc. and JCR has to do those activities in
parallel but 50 seconds should be enough to complete the process and release
the lock.
We upload approximately 2000 documents < 3-5 MB every day. Plus other DMS
operations are there like checkout, view, delete, etc.
We did some testing. We tried to upload multiple documents parallel on same
node with 2 different users. This creates Lock timeout issue when DMS is
already loaded. Is it possible that DMS is taking longer time in other
activities like Indexing, synchronization, etc. and hence locking thread not
getting enough opportunity/space to release the lock?
Please suggest the way to handle the issue.
--