www.beatsoo.org - free application performance monitoring from world wide locations.
On May 18, 2015 10:56 PM, "Vladimir Sitnikov" <[email protected]> wrote: > > > The scheduler use absolute times and doesn't serve > well this need. > > Clear "start time" and "end time" fields (make them empty) > Put the required test duration into "duration" field (in seconds as > the label suggests) of a thread group. > That is it. Good point. > > >I can't imagine building complex scenarios without the thread groups coming > >from the jmeter plugins project. > > Please go ahead and tell us which requirements force you to use thread > groups from jmeter-plugins. > We (at my company) do have complex tests, complex loads, etc, yet we > use out-of-the-box thread groups. > Actually only the one mentioned above which is obsolete. I was using the ramp down feature for quite some time but I don't anymore. So no other points from me. > Vladimir
