Hi Vladimir and all,

I agree with waiting two weeks to include the infrastructure for PR 6389 in
the 6.0 release.

Additionally, I have been following your work on the pgjdbc documentation.
I believe we should consider a similar restructuring for the JMeter
documentation as well.

Antonio Gomes Rodrigues

Le mer. 20 mai 2026 à 22:25, Vladimir Sitnikov <[email protected]>
a écrit :

> Hi Felix, Antonio, all,
>
> Sorry for the slow response. Here's a quick status update.
>
> PR 6389 / the "explicitly unset" gutter work: I estimate one to two more
> weeks to get the current branch
> (gutter pattern) into reviewable shape.
>
> Past that, extending the new UX to every relevant field can be incremental
> follow-up PRs.
> So we have a choice: wait the two weeks and include the infrastructure in
> 6.0, or cut 6.0 now and land it in a follow-up. Either works for me;
> opinions welcome.
>
> On "can anyone help out": yes. Separately from this thread, Shane Evans
> (BlazeMeter / Perforce) reached out about dedicating engineering resources
> to the project.
> Their concrete pain is merged-but-unreleased dependency/security fixes
> blocking their customers (the Tika PRs #6556 and #6579 were the examples).
> I've put him in touch with Milamber over email. Useful places their
> bandwidth could plug in:
>  - reviewer/tester capacity on open 6.0-scoped PRs
>  - testing release candidates (vote with results) when 6.0 RC is cut
>  - regressions reported against nightlies
>
> I'll follow up separately on PR 6661 (oro default), 6610, and the
> rhino-engine question.
>
> Vladimir
>

Reply via email to