Thanks, I am ok with this.

But I am not sure I understand the overall sentiment. KIPs are supposed to be completed by feature freeze, so if we want to give more time for KIPs to get completed, we should have extended feature freeze deadling instead (and we already effectively gave two more weeks, so we adding a third one now)

And we should use the time between feature freeze and code freeze to revert changes of non-completed KIPs as necessary (ie, public API changes or similar -- we opened two PR just today now that we have a 4.4 branch from our side)

Since feature freeze, actually only bug-fixes and minor KIP follow ups [of completed KIPs] and new tests should get merged into AK 4.4 branch, to stabilize the release branch before code freeze.

After code freeze, we should only accept blockers, not regular bug-fixes or minor improvements any longer. Maybe there is some confusion about how the deadlines are intended to work?


-Matthias

On 8/11/26 2:22 AM, Chia-Ping Tsai wrote:
hi Matthias

Given that there are still 7 incomplete KIPs and most of them are almost there, 
I think it makes sense to extend the code freeze deadline by one week (to Aug 
19th) to give the authors a bit more time.

However, after this extension, we should strictly freeze it. Reverting a KIP 
from 4.4.0 is absolutely fine if the author does not have the bandwidth to 
complete it by the new deadline.

I will review all tickets marked for 4.4.0 soon to ensure we don't miss any 
critical bugs.