Yang Liu created KYLIN-1841:
-------------------------------
Summary: Refresh or build different segments of one cube
simultaneously
Key: KYLIN-1841
URL: https://issues.apache.org/jira/browse/KYLIN-1841
Project: Kylin
Issue Type: Improvement
Components: Job Engine
Affects Versions: v1.5.2
Reporter: Yang Liu
Assignee: Dong Li
Fix For: Future
If some old segments need to be refreshed and a new segment is biulding at the
same time, I have to wait for the new segment finish building, and then refresh
the old one, sometimes if the refresh of old segments lasts too long, the
upcoming build of a new segment may fail.
so, i'm wondering If Kylin can supports refresh or build different segments of
one cube
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)