On 2/14/2014 1:49 PM, Areek Zillur wrote:
> I am assuming the snapshot of the ref guide is also taken for the
> release, so does that mean changes in ref guide has to be made before
> the snapshot (of the release)? or is the ref guide snapshot taken
> seperately from the release snapshot?

It would be great to have a ref guide ready along with the release, but
in its short history, it has so far been handled and released
separately, with its own rc/vote cycles.  We've had a grand total of
three ref-guide releases now.

Thanks,
Shawn


---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org
For additional commands, e-mail: dev-h...@lucene.apache.org

Reply via email to