On 2/14/2014 1:49 PM, Areek Zillur wrote: > I am assuming the snapshot of the ref guide is also taken for the > release, so does that mean changes in ref guide has to be made before > the snapshot (of the release)? or is the ref guide snapshot taken > seperately from the release snapshot?
It would be great to have a ref guide ready along with the release, but in its short history, it has so far been handled and released separately, with its own rc/vote cycles. We've had a grand total of three ref-guide releases now. Thanks, Shawn --------------------------------------------------------------------- To unsubscribe, e-mail: dev-unsubscr...@lucene.apache.org For additional commands, e-mail: dev-h...@lucene.apache.org