On 4/20/07, [EMAIL PROTECTED] <[EMAIL PROTECTED]> wrote:

I hope that I am not asking for more features as you are finalizing 1.1

3)  When a build fails contiuum must trigger another build in X minutes
(configurable), based on the 2nd build the notification should be send out.
This will avoid errors due to partial check-ins

The problem was addressed in a slightly different way.  Continuum 1.1
has a 'quiet period'.  If there have been changes in the last X
minutes (configurable), Continuum will skip that scheduled build,
thinking you migh be in the middle of a check-in.

--
Wendy

Reply via email to