Looks like Ryan got there first, which is awesome. Thanks for cleaning up my mess :)
On Mon, Oct 23, 2017 at 10:04 AM, Casey Stella <ceste...@gmail.com> wrote: > Yeah, that could be a consequence. With the cache in place, the calls to > delete are async. This isn't generally a problem in an actual > installation, but in the integration tests, it can take some time to sync > up (depending on the load). I ran it 20 or so times teasing these out, but > it's never quite enough. PR pending. :) > > On Mon, Oct 23, 2017 at 9:58 AM, Justin Leet <justinjl...@gmail.com> > wrote: > >> See: METRON-1274 <https://issues.apache.org/jira/browse/METRON-1274> and >> https://travis-ci.org/apache/metron/builds >> >> An example failure is https://travis-ci.org/apache/m >> etron/builds/290806887 >> >> This is possibly intermittent and possibly a result of METRON-1241 >> <https://issues.apache.org/jira/browse/METRON-1241>, but it hasn't been >> dug >> into yet. More details are in the ticket. >> >> Please refrain from merging PRs into master until this is resolved. >> >> Thanks, >> Justin >> > >