Team, I'd like to start a vote thread (with lazy consensus [1]) for NIP-29 [2] which aims to allow an existing flow / Process Group to have its state and configuration migrated to a new Connector when an appropriate Connector is created in order to encapsulate the flow.
I'll leave this open for 3 days and if nobody objects will consider the NIP has been approved. The actual PR/code-change will still go through our normal RTC process. Thanks Mark [1] https://apache.org/foundation/voting.html#LazyConsensus [2] https://issues.apache.org/jira/browse/NIP-29
