[
https://issues.apache.org/jira/browse/ODE-1009?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Tammo van Lessen updated ODE-1009:
----------------------------------
Fix Version/s: (was: 1.3.7)
> Event handler must be installed AFTER an initial start activity has been
> completed
> ----------------------------------------------------------------------------------
>
> Key: ODE-1009
> URL: https://issues.apache.org/jira/browse/ODE-1009
> Project: ODE
> Issue Type: Bug
> Components: BPEL Runtime
> Reporter: Tammo van Lessen
> Fix For: 1.4
>
>
> See spec Sec. 12.1, p. 166: An initial start activity is the start activity
> that caused a particular process instance to be instantiated. If a scope
> contains an initial start activity then the start activity MUST complete
> before the event handlers are installed.
> This makes sure that a correlation set can be initialized before an event
> handler is installed that is using the same cset.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)