[ 
https://issues.apache.org/jira/browse/OFBIZ-5296?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Sharan Foga updated OFBIZ-5296:
-------------------------------
    Sprint: Bug Crush Event - 21/2/2015

> AtP of products should be adjusted when production run is confirmed
> -------------------------------------------------------------------
>
>                 Key: OFBIZ-5296
>                 URL: https://issues.apache.org/jira/browse/OFBIZ-5296
>             Project: OFBiz
>          Issue Type: Improvement
>          Components: manufacturing, product
>    Affects Versions: Trunk
>            Reporter: Pierre Smits
>
> When a production run is confirmed we know what is intended to go in the 
> production run (the components or ingredients aka the raw materials) and what 
> is intended to go out (the finished product).
> Unlike with an order, the AtP (Availability to Promise) of the goods involved 
> does not get adjusted. 
> The result is that requirements for PO or even the PO itself get generated to 
> late (at the moment when QoH reaches minimum stock in stead of when AtP 
> reaches minimum stock).
> Following scenarios need to be resolved:
> 1. On confirmation of the production run (action = Confirm), the AtP of the 
> product to be produced must increase and the AtP of materials needed must 
> decrease.
> 2. When production is running and materials have been released to the 
> production run, it is possible to return materials back to inventory. When 
> doing so, the AtP of the materials must be adjusted accordingly with the same 
> date-time and quantity as the returned materials.
> 3. When a production run has rejected end products the AtP of the end product 
> must be adjusted with the same date-time and quantity as the declaration of 
> the rejected product.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to