https://issues.apache.org/jira/browse/OFBIZ-7355?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Swapnil Shah updated OFBIZ-7355:
--------------------------------
Attachment: screenshot-1.png
> OFBIZ-6964: Document finalized business requirements to support replenishment
> planning through any inter-company facility
> -------------------------------------------------------------------------------------------------------------------------
>
> Key: OFBIZ-7355
> URL: https://issues.apache.org/jira/browse/OFBIZ-7355
> Project: OFBiz
> Issue Type: Sub-task
> Components: manufacturing, order, product
> Affects Versions: 15.12.01
> Reporter: Swapnil Shah
> Assignee: Swapnil Shah
> Fix For: Upcoming Branch
>
> Attachments: screenshot-1.png
>
>
> Here are the most common set of business requirement to support product level
> replenishment within a given facility(store/warehouse) via any inter-company
> facility (preferred warehouse/stocking facility) before raising the purchase
> order from an outside vendors/suppliers.
> In current standard OFbiz workflow there are essentially two basic types of
> material requirements generated at product-facility level. Both of these can
> be created manually or could be suggested by MRP engine:
> * First, is "Product Requirement" which suggests that the given product is
> going to be low or out of stock within any given facility in a given time
> frame based on upstream demand signals within the supply chain and hence can
> more commonly be treated as Purchase Requirement that need to be eventually
> transformed as Purchase Orders to be raised from a given vendor/supplier
> * Second, is "Internal Requirement" which suggests that the given product is
> going to be low or out of stock within any given facility in a given time
> frame based on upstream demand within the supply chain. But such products can
> be internally manufactured(produced) and hence can more commonly be treated
> as Production Requirement that need to be eventually transformed as
> Production Order (Production Run).
> *Gap*
> Currently the OFbiz planning algorithm (aka MRP) generate the requirement by
> only considering the supply available within the given facility. But there is
> no planning logic built into the system which can support and look up the
> supply availability in a complex supply chain setup where business could be
> run using multiple facilities spread geographically. A more common examples
> could be brick and mortar retail stores chain having multiple stores spread
> across geographically. Or any manufacturing business that own multiple
> production facilities and warehouse spread across geographically.
> *Requirement*
> There are many instances, where material visibility in a multi-facility setup
> within an organization or company is not very accurately gauged. We would
> need to start building an intelligent planning system that could gauge such
> material availability across facilities and honor them while furnishing the
> requirements around any product within any given facility.
> Let's consider following use case (Please refer to attached screenshot for
> reference):
> * A retail chain has multiple stores and say a given physical store
> 'Store_01' and is strategically located near two warehouse in the region say
> Whse_01 & Whse_02,
> * One centralized warehouse(Main/buffer) say 'Backup_Whse' that supplies
> material to all the stores and regional warehouse
> * Any retails store e.g. Store_01 shouldn't raise purchase order from any
> outside vendor directly.
> * As Store_01 is strategically located near Whse_01 & Whse_02, so system
> should always suggest to replenish any product shortfall by first looking up
> and pulling up available supply from Whse_01 & Whse_02 and then from
> Backup_Whse in that order of priority.
> * Banckup_Whse mostly works on push system and supplies the products to all
> regional warehouse and physical stores.
> Now we could design an OFbiz based replenishment planning that :
> * Could allow to associate and rank the facilities(physical store/warehouse)
> that could replenish the material at any other facility (physical
> store/warehouse)
> * Could suggest the "*Transfer Requirement*" by gauging the product shortfall
> within any given facility product-facility at any given point of time by
> * Could allow to configure and manage the setting at facility(ProductStore or
> ProductFacility) level, to let planning engine know whether given facility
> could replenish stock via Transfer Requirement from any other facility. If
> not then it could take normal route of replenishment via Purchase Order or
> Production Order route.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)