The usual approach to this kind of problem is to use techniques from concurrent programming that involve scheduling. I'm most familiar with Ada, where there's a long history of work in this area. A classic text is
Klein, M. H., et al., 1993: A Practitioner's Handbook for Real-Time Analysis: Guide to Rate Monotonic Analysis for Real-Time Systems, Kluwer, Boston, MA These scheduling problems are usually divided into soft problems, where the consequences of missing the schedule are not catastrophic and hard problems, where missing the schedule causes a system failure that is capable of hurting people. The analysis in this reference suggests that there are two kinds of approaches to scheduling that can be guaranteed to work: Rate Monotonic with Earliest Deadline First (EDF) which allows you to take up about 70% of the production capacity and scheduling with homogeneous processes which allows you to move to nearly 100% of capacity. You can think of these as the difference between the traffic flow of an interstate highway and a railroad. In the former, each car has some average distance between itself and the other vehicles, but the car can move around within that average distance. In the latter, the distance between cars is pretty close to fixed. Two more recent works are Burns, A. and Wellings, A., 2007: Concurrent and Real-Time Programming in Ada, Cambridge Univ. Press, Cambridge, UK and McCormick, J. W., Singhoff, F., and Hugues, J., 2011: Building Parallel, Embedded, and Real-Time Applications with Ada, Cambridge Univ. Press, Cambridge, UK Both of these works cover various approaches to building a production scheduling environment. The concerns include deadlock, resource starvation, and system component failures. In cases where the system uses priorities to help derive the schedule, you can also have priority inversion. The scheduling problem has a pretty large literature since it shows up not just in the IT environment, but also in any organization that has to deal with scheduling scarce resources. You might also want to take a look at the work by Leslie Lamport: <http://research.microsoft.com/en-us/um/people/lamport/pubs/pubs.html> Lamport has an analysis tool known as TLA+ that has been used for formal analysis of scheduling requirements. This tool is available online. You can go to the TLA Home Page <http://research.microsoft.com/en-us/um/people/lamport/tla/tla.html> and download it from there. As you might expect, this kind of problem is not trivial - and even experienced people make design mistakes. I don't have an easy solution to suggest to you. To do this kind of work properly, you'll need to conduct an analysis based on the environment you'll be working in. Also, as Lamport explains, you have to worry about the basic scheduling issues - and then you need to deal with scheduling in the presence of unreliable components. The difference between professional scheduling analysis and simple analysis is in whether the consequences of failure can kill people or just simply manually restarting the system and then figuring out what got corrupted. Bruce B On Mon, Sep 21, 2015 at 5:27 PM, Mallder, Valerie < [email protected]> wrote: > Hi All, > > What is the easiest way to prevent an improper start of workflow? > > I have a cron job that sends an event (i.e. once an hour) to my workflow > manager telling workflow manager to start a workflow. But, the workflow > could take a long time to run depending on how many files are available to > be processed at that time. If the workflow takes longer than an hour to > complete, the cron job is going to send another event to workflow manager > telling it to start the workflow again. But I don't want it to start the > workflow again if the previous workflow hasn't completed yet. It's > perfectly OK for workflow manager to ignore that second request to start > the workflow again and just wait for the next event to be sent by the cron > job. > > I don't want to reinvent the wheel. Has anyone already done something > this? I've looked into the workflow preconditions, and I created a > WorkflowStatusCondition class to use as a precondition. But, I can't tell > if it is possible to check the status of the first workflow instance from > within a WorkflowConditionInstance object in a second workflow instance. > > Does anyone know how I would do that? > > Val > > > Valerie A. Mallder > > New Horizons Deputy Mission System Engineer > The Johns Hopkins University/Applied Physics Laboratory > 11100 Johns Hopkins Rd (MS 23-282), Laurel, MD 20723 > 240-228-7846 (Office) 410-504-2233 (Blackberry) > >