[ 
https://issues.apache.org/jira/browse/OOZIE-1578?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13797298#comment-13797298
 ] 

Bowen Zhang commented on OOZIE-1578:
------------------------------------

[~rkanter], thoughts?

> Coordinator jobs with cron frequency should be invalidated upon submission if 
> nothing would be materialized during run time 
> ----------------------------------------------------------------------------------------------------------------------------
>
>                 Key: OOZIE-1578
>                 URL: https://issues.apache.org/jira/browse/OOZIE-1578
>             Project: Oozie
>          Issue Type: Bug
>            Reporter: Bowen Zhang
>            Assignee: Bowen Zhang
>
> If a user specifies a cron frequency that materializes nothing between start 
> and end time, the coordinator job will remain "RUNNING" forever. This is due 
> to the way we update coord jobs in StatusTransitService when we select 
> coordinator jobs to be updated by last modified time of coordinator actions 
> in function coordTransit(). A coordinator job with no materialized actions 
> will never be selected to update the terminal status. This is not an issue 
> before cron frequency is introduced since every coordinator job is guaranteed 
> to have materialized actions.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Reply via email to