[ 
https://issues.apache.org/jira/browse/OOZIE-1532?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13877677#comment-13877677
 ] 

Bowen Zhang commented on OOZIE-1532:
------------------------------------

[~sriksun], so we don't want to purge any finished subworkflows of a long 
running workflow. We only want to purge coord actions of long running coord 
jobs. And, when you say "coord action", you mean purging both "coord action" in 
the "COORD_ACTIONS" table and the corresponding "workflow" in the "WF_JOBS" 
table, right?

> Purging should remove completed children job for long running coordinator jobs
> ------------------------------------------------------------------------------
>
>                 Key: OOZIE-1532
>                 URL: https://issues.apache.org/jira/browse/OOZIE-1532
>             Project: Oozie
>          Issue Type: New Feature
>            Reporter: Srikanth Sundarrajan
>            Assignee: Bowen Zhang
>
> Specifically, this is for long running coordinator jobs with high frequency. 
> all child workflows are never purged as the coord job is still running.
> Oozie server configuration that indicates how many coordinator actions 
> frequency ticks to keep. By doing this it would be possible to purge running 
> coord jobs. By default this would not be enabled and the current logic would 
> remain.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)

Reply via email to