[ https://issues.apache.org/jira/browse/OOZIE-1950?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Shwetha G S updated OOZIE-1950: ------------------------------- Attachment: OOZIE-1950-v7.patch > Coordinator job info should support timestamp (nominal time) > ------------------------------------------------------------ > > Key: OOZIE-1950 > URL: https://issues.apache.org/jira/browse/OOZIE-1950 > Project: Oozie > Issue Type: Bug > Reporter: Purshotam Shah > Assignee: Shwetha G S > Fix For: 4.1.0 > > Attachments: OOZIE-1950-v2.patch, OOZIE-1950-v3.patch, > OOZIE-1950-v4.patch, OOZIE-1950-v4.patch, OOZIE-1950-v6.patch, > OOZIE-1950-v7.patch, OOZIE-1950.patch > > > It will be useful for user to list all actions (with length and offset) > after/before nominal time. -- This message was sent by Atlassian JIRA (v6.3.4#6332)