James Taylor created PHOENIX-1519:
-------------------------------------

             Summary: Determine the usefulness of tracing
                 Key: PHOENIX-1519
                 URL: https://issues.apache.org/jira/browse/PHOENIX-1519
             Project: Phoenix
          Issue Type: Sub-task
            Reporter: James Taylor


In order to help prioritize the child JIRAs under PHOENIX-1121, we need to do a 
usability study around tracing. What problem(s) are we trying to solve and 
what's the delta between the existing tracing feature and the required tracing 
features.

For example, is the main use case of tracing to determine the top 10 queries 
that take the longest amount of time in production? Would we then want tracing 
on all the time, so having a way to enable/disable tracing (PHOENIX-1433, 
PHOENIX-1191, PHOENIX-1518, PHOENIX-1115) becomes moot.

Or is it more of something that would be used in a perf testing environment 
where we'd need to information generated to be only for a particular query (in 
which case the above JIRAs are more important)?



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to