[
https://issues.apache.org/jira/browse/PHOENIX-5468?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Istvan Toth resolved PHOENIX-5468.
----------------------------------
Fix Version/s: (was: 5.1.0)
connectors-1.0.0
Resolution: Fixed
Merged.
Thanks for the review [~elserj]
I didn't document testing with JVM11, as first we need to have a document about
building and testing where I can add that.
> [connectors] Enable running the test suite with JDK11
> -----------------------------------------------------
>
> Key: PHOENIX-5468
> URL: https://issues.apache.org/jira/browse/PHOENIX-5468
> Project: Phoenix
> Issue Type: Improvement
> Components: connectors
> Reporter: Istvan Toth
> Assignee: Istvan Toth
> Priority: Major
> Fix For: connectors-1.0.0
>
>
> As HBase runs on JDK11, Phoenix should also support JDK11.
> A first step is making sure that we can run the tests on JDK11, while still
> building on JDK8.
> Right now, the test suite cannot be run with JDK11, because it tries to run
> the failsafe tests with a VM setting that prevent JDK11 from starting.
--
This message was sent by Atlassian Jira
(v8.3.4#803005)