[ 
https://issues.apache.org/jira/browse/PHOENIX-5962?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Istvan Toth reassigned PHOENIX-5962:
------------------------------------

    Assignee: Richard Antal

> Stabilize builds
> ----------------
>
>                 Key: PHOENIX-5962
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-5962
>             Project: Phoenix
>          Issue Type: Task
>            Reporter: Richard Antal
>            Assignee: Richard Antal
>            Priority: Major
>         Attachments: PHOENIX-5962.master.v1.patch, 
> PHOENIX-5962.master.v2.patch
>
>
> Last 2 build was aborted becauseĀ Build timed out (after 360 minutes).
>  Search the possible cause of the problem and try to fix it.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

Reply via email to