We will need to update the minimum Java compile version and runtime 
requirements only if the vector indexes work goes in, specifically the phase 2 
HNSW work. That brings in JVector as a dependency, which is Java 11+. Otherwise 
things can remain the same. Perhaps the discussion about minimum Java version 
can happen in that context?

Agreed, I will be working on test fixes and de-flaking right away when I get 
back from vacation in November, there is no reason to wait.

> On Oct 14, 2026, at 10:58 PM, Viraj Jasani <[email protected]> wrote:
> 
> I will create the jira soon. However, at broader level, I think the feature
> should be hopefully completed around same time as consistent HA failover.
> 
> There are many improvements and fixes (and test fixes for flaky tests, very
> important) to be merged before 5.4.0. In the meantime, we can conclude the
> Java compile version related changes and get the changes merged?
> 
> 
> On Wed, Oct 14, 2026 at 12:38 PM Andrew Purtell <[email protected]>
> wrote:
> 
>> Sure, we can wait on completion of the work to add a protobuf datatype
>> Viraj. What is the JIRA for that?
>> 
>> On Wed, Oct 14, 2026 at 8:31 AM Viraj Jasani <[email protected]> wrote:
>> 
>>> Thank you for starting the thread, Andrew.
>>> 
>>> Thank you for also taking the role of RM for 5.4.0 release.
>>> 
>>> I agree with the above scope. I don’t have strong opinion on dropping
>> JDK 8
>>> support in minor release line, but given that we have significantly
>> larger
>>> features getting released in minor releases (5.3.0, 5.4.0), it should be
>>> okay to drop JDK 8 support.
>>> 
>>> In addition to the above listed features and improvements, one more
>>> upcoming feature is support for Protobuf data type. This would enhance
>>> Phoenix document database capability.
>>> 
>>> 
>>> On Fri, Oct 9, 2026 at 1:49 PM Andrew Purtell <[email protected]>
>> wrote:
>>> 
>>>> Hi all,
>>>> 
>>>> I propose that we start work toward Phoenix 5.4.0. As such, I
>>>> volunteer myself as your RM for the 5.4.0 release and will start
>>>> the tasks required to complete it.
>>>> 
>>>> Please give your feedback on the plan, and on the questions toward
>>>> the end of this mail.
>>>> 
>>>> SCOPE
>>>> 
>>>> 5.4.0 contains everything that has landed on master so far
>>>> and including these additional in-flight features:
>>>> 
>>>>  - EXPLAIN improvements (PHOENIX-7876) -- committed to master
>>>>  - V2 WHERE optimizer (PHOENIX-6791) -- PR #2428 is approved.
>>>>  - Consistent Failover (PHOENIX-7562) -- in development on the
>>>>    PHOENIX-7562-feature-new branch.
>>>>  - Vector indexes, Phase 1 and Phase 2 (PHOENIX-7998 and
>>>>    PHOENIX-8009, umbrella PHOENIX-8008) -- Both are in review.
>>>> 
>>>> Master also has TRUNCATE TABLE (PHOENIX-300), and numerous other
>>>> changes that are not on 5.3, committed over the intervening time.
>>>> 
>>>> The V2 WHERE optimizer is off by default in 5.4.0. Users will enable
>>>> it per their discretion with phoenix.where.optimizer.v2.enabled=true.
>>>> Consistent Failover and Vector Indexes are also opt-in features that
>>>> do not have an impact unless configured and enabled.
>>>> 
>>>> We will cut the 5.4 branch only after all of the features above are
>>>> merged to master. For this reason, the date of the cut depends on the
>>>> readiness of the features, with the possible exception of Consistent
>>>> Failover, which has 21 open subtasks. Stabilization of 5.4 branch can
>>>> begin with most everything else in place and Consistent Failover can
>>>> come in at any point as a backport of the merge commit to master
>>>> branch.
>>>> 
>>>> MINIMUM JAVA VERSION POLICY
>>>> 
>>>> 5.4.0 as proposed changes the minimum supported Java version policy:
>>>> 
>>>>  - Minimum: Java 11. 5.4.0 will not build or run on Java 8.
>>>>  - Recommended: Java 17.
>>>>  - Suggested for vector indexes: Java 21.
>>>> 
>>>> Phoenix ships multi-release jars. On Java 21, the JVM loads vector
>>>> kernels that use the Panama Vector API. On Java 11 and 17, it loads
>>>> portable kernels.
>>>> 
>>>> Although this is a significant change for users, it is unlikely users
>>>> remain on Java 8 for a myriad of technical and compliance related
>>>> reasons. The release notes will state the policy clearly. Users who
>>>> must stay on Java 8 can continue with the 5.3 release line.
>>>> 
>>>> PLAN
>>>> 
>>>>  Phase 1. Land the features on master. PHOENIX-6791 merges first.
>>>>    PHOENIX-7998 and PHOENIX-8009 merge in sequence. PHOENIX-8009
>>>>    also moves the build and CI to Java 11. Consistent Failover
>>>>    merges last.
>>>> 
>>>>  Phase 2. Cut the 5.4 branch. Master moves to 5.5.0-SNAPSHOT. We
>>>>    triage the unresolved 5.4.0 issues in JIRA, and keep only the
>>>>    release blockers.
>>>> 
>>>>  Phase 3. Stabilize. The work includes these items:
>>>>    - Fix or quarantine flaky tests.
>>>>    - Harden each new feature.
>>>>    - Test compatibility and upgrade from 5.2 and 5.3.
>>>>    - Build and test each HBase profile on JDK 11, 17, and 21.
>>>>    - Review licenses for the new dependencies.
>>>>    - Update the release tooling to JDK 17.
>>>>    - Check the downstream projects.
>>>>    - Write the release notes and documentation.
>>>> 
>>>>  Phase 4. Release candidates and vote.
>>>> 
>>>> The Critical issues PHOENIX-7279 and PHOENIX-7596 currently block
>>>> releasing.
>>>> 
>>>> The work of stabilizing the tests is expected to be the bulk of the
>>>> required time and effort.
>>>> 
>>>> On the 5.4 branch, bug fixes, test fixes, and documentation can go in
>>>> after review. New features and behavior changes need the consent of
>>>> the release manager.
>>>> 
>>>> PHASE 3 WORKSTREAMS
>>>> 
>>>> 1. Test health
>>>> 
>>>> - Fix flaky tests, or quarantine them with a JIRA.
>>>> - Get the nightly results clean.
>>>> 
>>>> 2. Feature hardening
>>>> 
>>>> - V2 WHERE optimizer: Add a CI run of the full integration test
>>>>  suite with the V2 WHERE optimizer enabled.
>>>> - Consistent Failover: Run the cross-cluster integration tests.
>>>>  Test a rolling upgrade while clients that use the ZooKeeper-
>>>>  based HA connection continue to have service. Finish the HA client
>>>>  documentation.
>>>> - Vector indexes: Make sure that each shaded jar preserves the multi-
>>>>  release manifest.
>>>> 
>>>> 3. Compatibility and upgrade
>>>> 
>>>> - Use the backward compatibility test framework (PHOENIX-7702).
>>>>  Test 5.3 clients against 5.4 servers, and 5.4 clients against 5.3
>>>>  servers.
>>>> - Test the upgrade of the SYSTEM tables from 5.3.
>>>> - Test a rolling upgrade of the region servers from 5.3 to 5.4.
>>>> 
>>>> 4. Supported JDK matrix
>>>> 
>>>> - Build and test each HBase profile (2.5.0, 2.5, 2.6.0, 2.6) on JDKs
>>>>  11, 17, and 21.
>>>> - Record the supported combinations in the release notes.
>>>> 
>>>> 5. Dependencies and legal requirements
>>>> 
>>>> - Review LICENSE and NOTICE for the new dependencies and their
>>>>  transitive dependencies.
>>>> - Do a CVE scan of the binary artifacts.
>>>> - Ensure Apache RAT audits are successful.
>>>> 
>>>> 6. Release tooling
>>>> 
>>>> - The release image `dev/create-release/phoenix-rm/Dockerfile` uses
>>>>  JDK 8. Move it to JDK 11 at least, although JDK 17 is recommended.
>>>> - Do a dry run of the release scripts before RC0.
>>>> 
>>>> 7. Downstream projects
>>>> 
>>>> - Build `phoenix-queryserver` and `phoenix-connectors` against
>>>>  `5.4.0-SNAPSHOT` with Java 11 or later and document any changes
>>>>  required. Note that the 5.4.0 core release is not blocked by these
>>>>  downstreamers, who can continue with 5.3.
>>>> 
>>>> 8. Documentation
>>>> 
>>>> - The release notes will include these items:
>>>>  - The new minimum Java version policy.
>>>>  - The EXPLAIN format changes.
>>>>  - The new features, their flags or configuration options, and
>>>>    defaults.
>>>>  - The supported HBase versions and JDKs.
>>>> - Update the website documentation for vector indexes, Consistent
>>>>  Failover, and EXPLAIN improvements.
>>>> 
>>>> The exit criteria for Phase 3 are as follows:
>>>> 
>>>> - No release blockers are open.
>>>> - The nightly builds pass on the full platform matrix.
>>>> - The compatibility and upgrade tests pass.
>>>> - The release notes and documentation are complete.
>>>> - The release tooling dry run passes.
>>>> 
>>>> QUESTIONS
>>>> 
>>>> Do we agree on the scope?
>>>> 
>>>> Do we accept the minimum Java version policy for the 5.4 code line:
>>>> Java 11 minimum, Java 17 recommended, Java 21 suggested for vector
>>>> indexes?
>>>> 
>>>> Are there other current blockers in addition to PHOENIX-7279 and
>>>> PHOENIX-7596?
>>>> 
>>>> --
>>>> Best regards,
>>>> Andrew
>>>> 
>> 

Reply via email to