Gabriel Reid created PHOENIX-130:
------------------------------------
Summary: Separate execution of slow (integration) tests from fast
unit tests
Key: PHOENIX-130
URL: https://issues.apache.org/jira/browse/PHOENIX-130
Project: Phoenix
Issue Type: Improvement
Reporter: Gabriel Reid
The current collection of automated unit tests and integration tests takes a
significant amount of time to run (somewhere in the neighborhood of 90 minutes
on my machine).
I’d like to propose that the automated tests are split up into two groups:
* unit tests, which don’t make use of a running HBase and run quickly, and will
be run within the maven test phase
* integration tests, which do make use of a running HBase and run more slowly,
and will be run within the maven integration-test phase
This approach has the advantage that all fast-running unit tests will be run
before the integration tests, so if there is a minor issue the build will
fail-fast instead of first running long-running integration tests before
failing. It also makes it possible to quickly and regularly run “mvn test”
during development to run all unit tests in a matter of seconds.
--
This message was sent by Atlassian JIRA
(v6.2#6252)