[ 
https://issues.apache.org/jira/browse/PIG-2152?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Thejas M Nair updated PIG-2152:
-------------------------------

    Fix Version/s: 0.10
           Status: Patch Available  (was: Open)

> Null pointer exception while reporting progress
> -----------------------------------------------
>
>                 Key: PIG-2152
>                 URL: https://issues.apache.org/jira/browse/PIG-2152
>             Project: Pig
>          Issue Type: Bug
>    Affects Versions: 0.9.0
>            Reporter: Olga Natkovich
>             Fix For: 0.9.1, 0.10
>
>         Attachments: PIG-2152.1.patch, null_pointer_traces (copy)
>
>
> We have observed the following issues with code built from Pig 0.9 branch. We 
> have not seen this with earlier versions; however, since this happens once in 
> a while and is not reproducible at will it is not clear whether the issue is 
> specific to 0.9 or not.
> Here is the stack:
> java.lang.NullPointerException at
> org.apache.pig.backend.hadoop.executionengine.mapReduceLayer.ProgressableReporter.progress(ProgressableReporter.java:37)
> at
> org.apache.pig.backend.hadoop.executionengine.physicalLayer.relationalOperators.POForEach.processPlan(POForEach.java:399)
> at
> org.apache.pig.backend.hadoop.executionengine.physicalLayer.relationalOperators.POForEach.getNext(POForEach.java:284)
> at 
> org.apache.pig.backend.hadoop.executionengine.physicalLayer.PhysicalOperator.processInput(PhysicalOperator.java:290)
> at
> org.apache.pig.backend.hadoop.executionengine.physicalLayer.relationalOperators.POLocalRearrange.getNext(POLocalRearrange.java:256)
> at 
> org.apache.pig.backend.hadoop.executionengine.mapReduceLayer.PigMapBase.runPipeline(PigMapBase.java:261)
>  at
> org.apache.pig.backend.hadoop.executionengine.mapReduceLayer.PigMapBase.map(PigMapBase.java:256)
>  at
> org.apache.pig.backend.hadoop.executionengine.mapReduceLayer.PigMapBase.map(PigMapBase.java:58)
>  at
> org.apache.hadoop.mapreduce.Mapper.run(Mapper.java:144) at
> org.apache.hadoop.mapred.MapTask.runNewMapper(MapTask.java:764) at
> org.apache.hadoop.mapred.MapTask.run(MapTask.java:370) at 
> org.apache.hadoop.mapred.Child$4.run(Child.java:261) at
> java.security.AccessController.doPrivileged(Native Method) at 
> javax.security.auth.Subject.doAs(Subject.java:396) at
> org.apache.hadoop.security.UserGroupInformation.doAs(UserGroupInformation.java:1059)
>  at
> org.apache.hadoop.mapred.Child.main(Child.java:255) 
> Note that the code in progress function looks as follows:
> public void progress() {
>         if(rep!=null)
>             rep.progress();
>     }
> This points to some sort of synchronization issue 

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Reply via email to