[ https://issues.apache.org/jira/browse/DISPATCH-1540?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ]
Ganesh Murthy updated DISPATCH-1540: ------------------------------------ Affects Version/s: 1.10.0 > multiframe presettled messages not included in presettled count on downstream > router > ------------------------------------------------------------------------------------- > > Key: DISPATCH-1540 > URL: https://issues.apache.org/jira/browse/DISPATCH-1540 > Project: Qpid Dispatch > Issue Type: Bug > Affects Versions: 1.10.0 > Reporter: Gordon Sim > Assignee: Ganesh Murthy > Priority: Major > > Set up two routers connected to each other. Attach receiver to one, sender to > the other and send a large message (such that it is sent as multiple transfer > frames). > > Then look at the inter-router link stats for each router. The downstream > router (i.e. that to which receiver is attached), does not record the > delivery as presettled. -- This message was sent by Atlassian Jira (v8.3.4#803005) --------------------------------------------------------------------- To unsubscribe, e-mail: dev-unsubscr...@qpid.apache.org For additional commands, e-mail: dev-h...@qpid.apache.org