Hi All, I have updated STIP-30 with proposed phases, task checklists, and links to the existing tracking and implementation work:https://github.com/apache/seatunnel/issues/11364
The proposed sequence is: 1. Internal reporting foundation (#11512), with its scope unchanged. 2. MySQL validation, followed by parallel snapshot and freshness coverage. 3. Checkpoint, restore and recovery observability, coordinating with the related #11947 failover harness. 4. PostgreSQL and multi-source validation. 5. Additive job-detail API and bounded metrics. 6. Performance, compatibility, stability and documentation gates, starting alongside validation. The first MySQL validation slice is now a dependent draft PR:https://github.com/apache/seatunnel/pull/12137 It checks real source/sink data and naturally collected progress reports. The focused scenario passed twice on each of Java 8 and 11; broader CI and later scenarios remain open. No public API or metrics are added. The updated contract separates per-field value quality from report freshness and does not infer a stall from an unchanged offset. Enumerator collection is coordinator-owned, but execution may be on another member. Could you review the phase boundaries and remaining stabilization gates, particularly checkpoint/restore semantics and validation of both position families before freezing the public contract? These remain proposed steps, not a release commitment or a claim of full design acceptance. I will keep agreed decisions and linked work recorded on the STIP. Thanks all for your time and support Thanks, Goutam