Hello Steven
Indeed, it is a good time for a SIS release as it would be about 6
months after last release. I was waiting to synchronize with OSDU
release because OSDU provides extensive testing of coordinate
transformations. I will try to have a release candidate ready in staging
repository this week. The work to do is to finish a merge in progress
about ISO 19157 (data quality), verify if any dependency needs to be
upgraded, verify if javadoc is okay and do some extensive testing. After
Release Candidate 1 (RC1) is in staging repository, the plan is to leave
it there for a time long enough for OSDU release 15 testing. If any
issue is reported, a RC2 will be prepared. If there is no issue, RC1
will become directly the final release.
Martin