On 12 Feb 2010, at 12:03, Carsten Ziegeler wrote:

> Ian Boston wrote
>> 
>> I have done a patch[1] that reverts the changes and makes a release of all 
>> of the above possible. It builds, release:prepare works (but needs base to 
>> be released first so that server can bind to 2.0.6) and I have tested it in 
>> our custom environment with all our Ruby based integration tests. I might 
>> have missed something but there were no errors.
>> 
>> I would propose that we apply the patch (might be best if I do this from 
>> git->svn so deletes/moves/renames behave), 
>> release the items (Carsten?, just because your keys are better signed than 
>> mine)
>> and if it looks like the vote is going to pass (ie 3 committers have done 
>> validation) 
>> then revert the patch (I can do this git->svn) to allow JR2 move to happen.
>> 
> Sounds good to me with some additional comments :)
> 
> - I can do the releases
> - We have to properly reschedule the jira issues (volunteer?)

I can do that, I dont think there are too many version changes.

> 
> And
>> 908956 SLING-1366 : Use dynamic proxy to handle session#impersonate call.
> 
> I think this one should go into the release as this fixes a broken
> implementation. There is currently a line in there which excludes the
> pre jsr 283 interfaces. So we should remove this line.

I'll have a look in a moment and update my patch.

Ian



> 
> Regards
> Carsten
> 
> -- 
> Carsten Ziegeler