Roy Teeuwen created SLING-12349:
-----------------------------------

             Summary: Unable to set a maximum amount of Sling Jobs in parallel 
                 Key: SLING-12349
                 URL: https://issues.apache.org/jira/browse/SLING-12349
             Project: Sling
          Issue Type: Bug
          Components: Event
            Reporter: Roy Teeuwen


It is possible to set a maximum parallel of sling jobs on a queue 
configuration, but in systems where the platform itself already makes 20 
queue's and the customer's code also add's their own queue's, this 
configuration makes no sense because it is set per queue and not overall. The 
sum of the parallel could be way more than the amount of cores available, 
making the system unworkable if the separate queue's all have jobs at the same 
time

It would be logical that you can also set a maximum parallel overall for all 
queue's combined. Is there a reason that this is not already the case? Would 
there be anything against building this in?



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to