Chetan Mehrotra created SLING-5560:
--------------------------------------
Summary: Delay job processing to avoid unnecessary stale job
handling
Key: SLING-5560
URL: https://issues.apache.org/jira/browse/SLING-5560
Project: Sling
Issue Type: Improvement
Components: Extensions
Reporter: Chetan Mehrotra
Fix For: Event 4.1.0
While running in a cluster (or in some case non cluster setup also) Topology
would become stable after "some" time. For e.g. in a 2 node setup by the time
first node comes up second node might not have started so topology would not
detect it and first node might think that second node is not there and it can
then start assigning job for that node to current node under stable job
processing.
Instead of doing this just right at startup job processing should start after
"some" delay such that topology becomes stable. This would avoid this
unnecessary work and probably even reduce load on the master
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)