Chetan Mehrotra created SLING-5560:
--------------------------------------

             Summary: Delay job processing to avoid unnecessary stale job 
handling
                 Key: SLING-5560
                 URL: https://issues.apache.org/jira/browse/SLING-5560
             Project: Sling
          Issue Type: Improvement
          Components: Extensions
            Reporter: Chetan Mehrotra
             Fix For: Event 4.1.0


While running in a cluster (or in some case non cluster setup also) Topology 
would become stable after "some" time. For e.g. in a 2 node setup by the time 
first node comes up second node might not have started so topology would not 
detect it and first node might think that second node is not there and it can 
then start assigning job for that node to current node under stable job 
processing.

Instead of doing this just right at startup job processing should start after 
"some" delay such that topology becomes stable. This would avoid this 
unnecessary work and probably even reduce load on the master



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to