Hi, since it was time to submit a report, I did submit the drafted report to the board.
The next report should be on schedule in March 2014. Best, - Fabian 2014/1/6 Fabian Christ <christ.fab...@googlemail.com>: > Hi, > > here is a draft for our board report that needs to be submitted ASAP. > The board meeting is scheduled for Jan 15, 2014. > > Please comment, add. > > Status report for the Apache Stanbol Project - January, 2014 > > Apache Stanbol provides a set of reusable components for semantic content > management. > > The project missed to report on their regular schedule in December 2013, > therefore this report was prepared for January 2014. > > There are no issues which require board attention at the moment. > > The project is performing well and new features are added on a regular basis. > The dev mailing list is actively in use. Requests from subscribers are handled > promptly. > > The release process is still slow which means that the project was unable > to produce a release since Feb 2013. The reason seems to be that release > preparation is to time consuming and there are not enough committers that > are capable of performing a release. > > As a consequence the current Stanbol users mostly rely on the latest versions > from the dev trunk or the already existing release branch. The project is > aware of this situation and is working on that issue. > > Subscribers on the dev list: 210 > No new committers were elected since June 2013. > > No releases were published. > Last release was: apache-stanbol-enhancement-engines-0.10.0 on Feb 2nd, 2013 > > > -- > Fabian > http://twitter.com/fctwitt -- Fabian http://twitter.com/fctwitt