[ 
https://issues.apache.org/jira/browse/STRATOS-695?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14543529#comment-14543529
 ] 

Shavindri Dissanayake commented on STRATOS-695:
-----------------------------------------------

 The content has been documented in [1]. Please verify and close/resolve the 
JIRA.

[1] 
https://cwiki.apache.org/confluence/display/STRATOS/4.1.0+Cartridge+Agent+Lifecycle

> [Wiki] - Improve Cartridge Documentation
> ----------------------------------------
>
>                 Key: STRATOS-695
>                 URL: https://issues.apache.org/jira/browse/STRATOS-695
>             Project: Stratos
>          Issue Type: Improvement
>            Reporter: Shiroshica Kulatilake
>            Assignee: Mariangela Hills
>            Priority: Minor
>             Fix For: 4.1.0
>
>
> 1. Currently in the cartridge agent life cycle page, both the flow chart as 
> well as the detailed steps talk about initiation of a cartridge and putting 
> down a cartridge in the same diagram / text block. It might be good to 
> separate these two aspects - e.g. have two sub sections - one for the 
> creation and the other for the putting down part.
> 2. When the term life cycle stages is mentioned a state diagram which 
> indicates each of the states the cartridge can be in would be good.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to