[ 
https://issues.apache.org/jira/browse/STRATOS-454?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Nirmal Fernando resolved STRATOS-454.
-------------------------------------

    Resolution: Fixed

Reka has done this improvement, hence resolving.

> Introducing Maintenance state to Topology
> -----------------------------------------
>
>                 Key: STRATOS-454
>                 URL: https://issues.apache.org/jira/browse/STRATOS-454
>             Project: Stratos
>          Issue Type: Improvement
>          Components: Cartridge Agent, Cloud Controller, Eventing
>    Affects Versions: 4.0.0 M7
>            Reporter: Reka Thirunavukkarasu
>            Assignee: Reka Thirunavukkarasu
>             Fix For: 4.0.0 Alpha
>
>
> In the graceful shutdown,  we keep the member as active until it receives 
> ReadyToShutdown event. In between these state changes, member will become 
> unavailable. So the LB needs to aware of that, in order to avoid sending 
> requests to a member which is going to graceful shutdown. I think that if we 
> introduce another state say Maintenance in the Topology, before the actual 
> shut down of the application inside the member takes place, then the LB will 
> act upon the Maintenance state and  remove the member from the active members 
> list.



--
This message was sent by Atlassian JIRA
(v6.1.5#6160)

Reply via email to