Hi,

here's my proposal - WDYT?

Am 26.01.2017 um 01:21 schrieb johndam...@apache.org:
> The board meeting is scheduled for Wed, 22 February 2017, 10:30 am PDT.
> The report for your podling will form a part of the Incubator PMC
> report. The Incubator PMC requires your report to be submitted 2 weeks
> before the board meeting, to allow sufficient time for review and
> submission (Wed, February 08).
<snip>
> This should be appended to the Incubator Wiki page at:
> 
> https://wiki.apache.org/incubator/February2017


<snip>
Tamaya

Tamaya is a highly flexible configuration solution based on an modular,
extensible and injectable key/value based design, which should provide a
minimal but extendible modern and functional API leveraging SE, ME and EE
environments.

Tamaya has been incubating since 2014-11-14.

Three most important issues to address in the move towards graduation:

  1. Extend Community
  2. Improve Documentation / finish new homepage
  3. Begin Graduate after 0.3

Any issues that the Incubator PMC (IPMC) or ASF Board wish/need to be
aware of?

We are thinking about graduating after the next release since our new
homepage contains information about many new features and we do have a
new module structure.

How has the community developed since the last report?

On conferences and after Oracle dropped the configuration JSR many
conversations started about Configuration in the Java world.
Apart from bugfixes the main new features is basic OSGi support
(currently still in development in sandbox module).

Weekly hangouts (monday 8pm Berlin time) take place to have shorter
feedback cycles, minutes are communicated via mail.


How has the project developed since the last report?

The infrastructure runs much more smoothly with the new module
structure: core, extensions, sandbox and a separate project for the
homepage based on jBake.

OSGi support is a big thing since different OSGi containers have their
problems. Good contact to Apache Karaf developers.

New homepage with new structure and more information available as
prototype via: https://tamaya.apache.org/jbake/ Homepage is connected to
its repository via gitpubsub.

Date of last release:

  2016-04-06

When were the last committers or PMC members elected?

  P. Ottlinger at 2016-04-24.
</snip>


Reply via email to