[ 
https://issues.apache.org/jira/browse/TIKA-4919?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

Tim Allison resolved TIKA-4919.
-------------------------------
    Fix Version/s: 4.1.0
       Resolution: Fixed

> Improve progress==totaltasktimeout logging
> ------------------------------------------
>
>                 Key: TIKA-4919
>                 URL: https://issues.apache.org/jira/browse/TIKA-4919
>             Project: Tika
>          Issue Type: Task
>            Reporter: Tim Allison
>            Priority: Trivial
>             Fix For: 4.1.0
>
>
> From [~rzo1] on stormcrawler: 
> [https://github.com/apache/stormcrawler/pull/2183#issuecomment-5811088871]
> {noformat}
> One thing for the Tika side: with TimeoutLimits(t, t) every parse logs 
> "progressTimeoutMillis >= totalTaskTimeoutMillis", and there's no way to 
> switch off the stall detector while keeping a total deadline, since 
> progress=0 is rejected. Could Tika allow progress == total, or treat 0 as 
> off? {noformat}



--
This message was sent by Atlassian Jira
(v8.20.10#820010)

Reply via email to