[ 
https://issues.apache.org/jira/browse/VCL-308?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14236061#comment-14236061
 ] 

ASF subversion and git services commented on VCL-308:
-----------------------------------------------------

Commit 1643420 from [~fapeeler] in branch 'vcl/trunk'
[ https://svn.apache.org/r1643420 ]

VCL-568, VCL-308
   
more tweaks on the flow

> Computer load log does not account for images that have to be transferred to 
> another management node
> ----------------------------------------------------------------------------------------------------
>
>                 Key: VCL-308
>                 URL: https://issues.apache.org/jira/browse/VCL-308
>             Project: VCL
>          Issue Type: Bug
>          Components: vcld (backend)
>    Affects Versions: 2.0
>            Reporter: Andy Kurth
>             Fix For: 2.4
>
>
> The estimated time remaining displayed to the user does not include the time 
> it takes to retrieve image files from another managment node during image 
> load.  If the scheduling system thinks the image is preloaded but is not and 
> image retrieval is required, "Est: 1 min remaining" is displayed.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Reply via email to