[
https://issues.apache.org/jira/browse/VCL-861?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]
Andy Kurth updated VCL-861:
---------------------------
Attachment: timetable-loop.png
> Web timetable endless loop
> --------------------------
>
> Key: VCL-861
> URL: https://issues.apache.org/jira/browse/VCL-861
> Project: VCL
> Issue Type: Bug
> Components: web gui (frontend)
> Affects Versions: 2.4
> Reporter: Andy Kurth
> Attachments: timetable-loop.png
>
>
> The website presents an endless loop when an image is not immediately
> available for the selected duration. An animated gif is attached to this
> Jira issue showing the loop. The animation shows an image which is currently
> available if 2 hours is selected. When the user changes the duration to 8
> hours, the *_Available Times_* box is presented. The user is shown various
> available times and selects one. Upon clicking *_Use Selected Time_*, the
> *_Available Times_* box reappears and contains the same selections. The can
> be repeated indefinitely.
> At the end of the animation, the user selects another timeslot with a shorter
> duration. This works as expected.
> Another minor problem is shown in the animation. After the user changes the
> duration from 2 to 8 hours, the following happens:
> * *_Loading_* icon appears
> * *_Available Times_* box appears briefly
> * *_Available Times_* box disappears before user can make a selection
> * *_Loading_* icon reappears
> * *_Available Times_* box appears again and user can make selection
> The hiccup should be fixed.
--
This message was sent by Atlassian JIRA
(v6.3.4#6332)