Chenya Zhang created YUNIKORN-830:
-------------------------------------

             Summary: Node sorting need to support "preferredDuringScheduling" 
node affinity
                 Key: YUNIKORN-830
                 URL: https://issues.apache.org/jira/browse/YUNIKORN-830
             Project: Apache YuniKorn
          Issue Type: New Feature
          Components: core - scheduler
            Reporter: Chenya Zhang
            Assignee: Chenya Zhang


YuniKorn scheduler is able to allocate pods based on the node affinity policy 
"requiredDuringScheduling", but not "preferredDuringScheduling" yet.

YuniKorn currently does a full node sorting every time. After 
[https://github.com/apache/incubator-yunikorn-core/pull/307], we will do 
sorting incrementally with an ordered B-tree. It can make scheduling different 
pods to preferred nodes a bit complicated.

Discussed with [~cheersyang] [~yuchaoran2011] for a potential solution:
 * Parse node label’s from the shim and send that to the core over SI  (via 
node attributes).
 * Parse the pod node-affinity preference in the shim and send that to the core.
 * Implement something in GetSchedulableNodeIterator().. today we directly 
retrieve nodes from btree with asce order; we still loop the nodes once, but 
keep 2 list, one for preferred nodes; when we iterate nodes in the scheduling 
cycle, we iterate the preferred list first.

Adding [~wilfreds] [~kmarton] for more discussion too.



--
This message was sent by Atlassian Jira
(v8.3.4#803005)

---------------------------------------------------------------------
To unsubscribe, e-mail: dev-unsubscr...@yunikorn.apache.org
For additional commands, e-mail: dev-h...@yunikorn.apache.org

Reply via email to