I think it unlikely that the security features will be ready by B4.
Kim Quirk wrote: > Dev team, > As followup from last night's meeting, to help direct the next two > release milestones (B4 and Trial-2), I have updated the 'Roadmap' on > the front page of Trac. Please look this over (I copied it here so you > can just scroll down), and don't hesitate to make comments. The bugs > will be sorted into these release bins according to this high level > description. We may further break Trial-2 into Alpha, Beta, Ship... > > B4 milestone says: > > "This build, scheduled for Mid June, is the final chance to fix > hardware and mechanical problems that were detected in the Beta Test 3 > build of the XO. 2000 units will be built and will go to trials in > multiple countries. > > Note that the B4 firmware will be finalized and delivered separately > from the Trial2 sugar code. The focus for B4 is middleware, power > management, first school server build, and bug fixes. > > Features: > > * FC7, python 2.5 > * Power management (eBook mode, USB power mgmt, suspend button, > tinderbox updates) > * Low level security features (kernal and firmware) > * First school server build > * School Server support for activation, registration > > Also during the B4 assembly, Ivan will do an onsite audit/discussion > of the mfg process for security" > > ----- > > The Trial-2 milestone says: > > "Trial-2 is defined as the sugar code release needed by the time B4 > units get to the country trials. Below is a list of features from the > highest priority to lowest, with the expectation that we will cut off > the Trial-2 feature list about one week before each of the major > milestones, alpha (late june), beta (late july) and final release, > which will be in September. > > Prioritized feature list: > > * Security, vserver code and integration > * Support for backup/restore with School Server > * Mfg Tracking Server > * Power management daemons > * Manual updates, don't loose user data > * Journal > * Chat or video chat > * Collaboration support for Browser, Abiword, Camera > * Security UI exposed > * Power management, Sugar UI > * Network code updates > * Collaboration support for other activites, games > * Video conference > * VoIP > > Details can be found in trac items or design specs. Activites that are > shipping can be found on the 'Activites' page of the wiki: > http://wiki.laptop.org/go/Activities " > > > Go to the source: http://dev.laptop.org/roadmap > <http://dev.laptop.org/roadmap> > > Thanks, > > Kim > > > > > On 5/16/07, *Mitch Bradley* <[EMAIL PROTECTED] > <mailto:[EMAIL PROTECTED]>> wrote: > > System Software Telecon, 2007-05-15 > > Attendance: Mitch, J5, Blizzard, Kim, cjb, Bernardo, Jim, Bryan, Luna, > Vance, Richard, > Ronak, Wad > > New action items: > > AI: Jim and Chris to check with Jonathan Blandford about Richard > Hughes > availability > > > B4 schedule. > > Target dates: > > 5/28 Verify boot2 code > 6/03* Nominations for new activities due > 6/08* OFW build due at Quanta > 6/08* All software packages due; bug fixes only after this > date by > approval only > 6/08-6/15* Integration and test of system image. > 6/12 B4 SMT prebuild > 6/15* B4 NAND image due at Quanta > 6/19 B4 Assembly (qty 2000) > > So we have 3 weeks before freeze > > Status > > cjb: > > - don't have kernel resume working on LX yet > - don't have DCON source mode working > Bernardo can help. > > We need a power management daemon soon. The volunteer is not > doing it. > > > David Woodhouse to be in Boston starting Sunday > > Ebook mode is working, but we need to clean it up after the > weekend hack > attack > Hopefully we can integrate it by the end of the week > > Richard: > > Tinderbox 2 is up and running. Needs a little work on some > power rails. > Running an extended suspend test. Want to predict lifetime in ebook > mode - hoping for 20 hours. > > Immediate priority is EC wakeup via keystrokes. > > Working with David Lin to fold new SCI-related changes into EC > build. > We will do a new firmware releasse, but will not try to funnel it > to Quanta for B3. > > Blizzard: > > Want to isolate power management milestone from UI milestone > > + Power management needed for B4 > > Need to specify sugar milestones for the end of June time frame > > + basic journal that works with some app > + collaboration that works with a chat client > + rudimentary peer-to-peer > > When will we switch to FC7? It might be about a week of work, > but J5's job will get a lot easier afterwards. The biggest > problem will probably be Python 2.5. Suggest middle of June > for cutover. FC7 goes gold at end of May. > > Update system. We don't have anybody to work on it now. > It is about two months or work, more or less. > > Wad > > School server initial feature set > > + network stability > + tunnel out for monitoring > + backup > - No special security for B4 > > J5: > > It is do-able to separate the UI part of the build from the base > system > It is a manual process right now. We want to automate it, but that > won't happen by the end of the week. > > We are going to have a repository for activities that won't be > in the > default build. > > Jim: > > We may need to push some B4 bugs out to Trial2. > > We need to start thinking about implementing security > > Machines are locking up at 40 C. We need to find out if it is > OOM or > thermal shutdown or something else. > > Mitch: > > LX firmware is pretty much done, so can resume whatever he was > working on before the LX cutover changed the game. > > Supporting B3 build. > > Short term: Fixing OFW JFFS2 driver memory utilization - > pathological > 1G NAND filesystems take 111MB of RAM, need to reduce that. > > Long-term: Wireless install - What is the time frame? > > Long-term: Security > > _______________________________________________ > Devel mailing list > [email protected] <mailto:[email protected]> > http://mailman.laptop.org/mailman/listinfo/devel > > _______________________________________________ Devel mailing list [email protected] http://mailman.laptop.org/mailman/listinfo/devel